Gold Member Since 2016
Audited Supplier
Wincoo Engineering Co., Ltd.

Automatic Tank Lifter, Automatic Tank Hydraulic Jacking Sytstem, Hydraulic Jacking for Tank manufacturer / supplier in China, offering Hydraulic Jacking System for Tank, Automatic Tank Hydraulic Jacking Sytstem\Hydraulic Lifter Fot Tank, Single Cantilever Type H-Beam Automatic Welding Machine/Automatic Welding Machine for Steel Structure Fabrication and so on.

(/ )

Hydraulic Jacking System for Tank

FOB Price: US $3,000-150,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $3,000-150,000/ Piece
Get Latest Price
Port: Tianjin, China
Production Capacity: 5000
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
Automatic welding machine for tank construction
37 Products
Content
Product Image
Product Name
FOB Price
Port
Basic Info
  • Type: Hydraulic Jack
  • Capacity (Load): 21-30T
  • Max Height: >400mm
  • Condition: New
  • Trademark: WINCOO
  • Specification: SGS, ISO9001, CE
  • HS Code: 8425421000
  • Structure: Hydraulic Jack
  • Power Source: Hydraulic
  • Certification: ISO 9001:2000
  • Engineer Oversea Service Is Available: More Than 5 Meter Tank
  • Transport Package: Container
  • Origin: China
Product Description
We are able to provide complete solution for tank welding with different construction method, both bottom-to-top and top-to-bottom tank construction, hydraulic lifting system are especially designed for top-to-bottom tank erection.

The following short description gives the working procedure in outline. It can in certain details be modified when required.
 
Step 1.  The tank bottom - plates are placed on the prepared foundation and welded together.
Step 2.  The beams or lattice work of the roof are assembled and finally joined to the upper rim of the shell ring.
Step 3.  The jacking equipment is installed in the tank. The plates of the second shell ring (next to the top ring) are positioned outside the first one.
Step4.   The completed part of the tank (roof and top shell ring) is lifted hydraulically to a height at which the plates of the second ring can be moved into place and the roof sheeting can be completed.
Step5.   The plates of the second shell ring are located exactly and welded together to the lower edge of the first ring.
Step6.   The plates of the third shell ring are placed outside the second shell ring.
Step7.   The completed part of the tank (roof the two uppermost shell rings) is lifted.
Step8.   The above cycle of operations is repeated until the last (bottom) shell ring is finished.
Step9.    The entire tank is lowered down to the bottom plate and welded to this.
Step10.  The lifting equipment is dismantled.


Hydraulic Jacking System for TankHydraulic Jacking System for TankHydraulic Jacking System for TankHydraulic Jacking System for TankHydraulic Jacking System for TankHydraulic Jacking System for Tank
You Might Also Like
Send your message to this supplier
Avatar
Mr. Jacky Nie
General Manager
*From:
To: Mr. Jacky Nie
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category