Customization: | Available |
---|---|
Cooling Way: | Air Cooling |
Shielding Gas: | Argon Gas |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
With the new round of development of oil and gas long-distance pipeline, as well as the owners' high requirements for pipeline welding quality, and at the same time convenient for the timeliness and accuracy of digital management of welding process data, automatic welding process method is fully implemented for long-distance pipeline welding.The pipeline processing equipment produced by our company has incomparable practicability and reliability. The pipeline processing equipment produced by our company has incomparable practicability and reliability. The PPAWM series split type automatic pipe welding machine is the main product specially developed by our company for pipeline prefabrication. It can be equipped with fusion gas welding, tungsten argon arc or submerged arc welding to achieve high-speed automatic pipeline welding.
1, On-line Performance: Excellent (Designed completely as per the on-line equipment of the production line)
2, Application: extremely broad (pipe and cover welding of various structures in various industries).
3, Welding Capacity: Excellent (250-350 inch/day, which is 4 times higher than the manual welding)
4, Operability: Good (applicable and easy to operate even if you are a new user)
5, Surface finishing: Excellent (the welding gun will be positioned in the optimum position always)
6, Welding qualification rate: 98% min (without re-working for the skilled operator).
7, Driving Reliability: Good (driven by frictional force, however, it is required to set essential balance weight to offset large bending moment caused by elbows for large diameter pipe, or providing a chain tensioner to improve the reliability of the driving).
Input voltage | 380V50HZ |
Tube diameter | DN100-600 |
Input capacity | 50kw |
Suitable length | 300-1200mm |
Wall thickness | 6-50mm |
Application materials | Carbon steel,stainless steel,alloy steel |
Artifacts requires | Can not influence the assembly qualified,welds form of corrosion,such as wrong side of nature and man for the defect.The error requirement:argon arc welding 1mm or less gas shielded welding 3mm or less |
Welding process | Argon arc/gas backing.argon arc/gas/submerged arc welding filler welding covering |
Welding form | Multi-level,multi-channel welding |
Welding torch lifting | Motor,stepping motor driver |
Work piece rotation | Round up and down pressure,motor reducer drive,speed adjustable stepless |
Welding power source | With reference to the above equipment list the power configuration in the table |
Apply to weld | The tube-tube,the tube-pipe elbow,the tube-flange,the tube-tee joint,pipe size head |
Form a complete set of logistics | 1 set,2 sets of car+7.5m,walking can be in orbit manual,meet different length of the bearing. |
Swing system | Argon arc:pendulum,gas shielded:line submerged arc:no swing swing:+/-25mmO(adjustable) the pendulum:20-60 times/min(adjustable)(not package about timing time) |
The base of mobile | Electric |
Welding qualified | Welding qualified rate of more than 98% |
Welding efficiency | 250-350-inch diameter/10hours |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.
What we can bring to you?
1. Support you to win the project during bidding phase.We can provide your more suitable configurations to help you shorten the constrcution time.